KRJ Approach
The KRJ team, headed by David V. Kromm, consists of many diverse talents. This team has worked together for over a decade in a seamless manner creating functional yet very pleasing architecture for communities by providing the following services:
Long Range Physical Facilities Planning
- Derive a set of goals for physical facilities.
- Study facts affecting planning decisions.
- Provide a set of alternative designs indicating overall organization of buildings and major services within buildings.
- Show phases of construction.
- Arrive at a consensus on optimum design.
- Develop drawings of existing facilities on a CADD system.
Feasibility Studies
- Verify availability of site utilities.
- Analyize suitability of site topography, road and highway access.
- Study zoning, ways of relating to zoning regulations.
- Study condition of existing building.
- Analyize cost and feasability.
- Utilize CADD and graphics/video technology.
Funding Campaign
- Provide graphics that communicate with the public.
- Show full motion 3D walk-throughs.
- Record of existing facilities.
- Make drawings and lists of spaces.
- Attend citizen meetings as required to answer questions.
- Incorporate feedback into design as required.
Space Programming and Allocation
- Study existing space utilization with growth projections.
- Define required spaces and space relationships.
- Use an environmental sheet format to communicate with team members and relate to other projects.
- Evaluate priorities.
- Utilize CADD and graphics/video technology.
Equipment Evaluation and Planning
- Specify equipment in flexible manner to meet client's needs and in-house abilities.
Information Technology Planning
- Define information technology needs.
- Evaluate information technology solutions.
- Analyze costs, prioritize.
- Integrate with architectural design.
- Multimedia classrooms, science labs, ITV classrooms, etc.
Architectural Design
- Generate and compare alternative designs.
- Make selections in accordance with project criteria and cost.
- Refine designs.
- Coordinate with all team members.
- Utilize CADD and graphics/video technology.
Interior Design and Furnishings Selection
- Provide full interior design / furnishings design service.
- Integrate with building design.
- Integrate with information technology.
Landscape Design
- Provide full landscape design service.
- Integrate site design with site and building plan.
- Meet educational and security needs.
Code Review and Building Analysis
- Analyze code compliance of new and existing buildings.
- Arrive at cost-effective solution.
Mechanical and Electrical Systems Design
- Meet educational requirements.
- Develop systems that are cost-effective in the near term and in the long run.
- Integrate with building design and information technology.
Cost Estimation and Monitoring
- Make early cost estimates for cost control during the conceptual phase.
- Refine cost estimates as design progresses.
- Utilize bid experience on similar projects, adjust for time, location, complexity, and project size.
- Make value analysis of design with cost information in hand.
Construction Documents
- Make drawing for purpose of government review, bidding and construction.
- Use ConDoc industry-wide format for readability.
- Use library of proven standard details adjusted and supplemented to meet project requirements.
- Use peer review at multiple stages of project development.
- Review drawings with checklist.
Computerized Specifications
- Derive specifications from set of master specifications developed in-house with educational requirements in mind.
- Tailor specifications to abilities of area contractors and material suppliers.
- Use CSI industry-wide format for readability.
Construction Observation and Administration
- Observe construction for quality control, fair payments to contractors and adherence to schedule.
- Equitably resolve conflicts arising during construction.